Line Check The HIPOT Equipment And Specific PPE At S03

Line check of HIPOT equipment and required specific PPE at S03.

Full Project »
Line Check LOTO Implementation Is Comply

Line check confirms that LOTO implementation is compliant with safety procedures.

Full Project »
S02- line check LOTO system is in place

Line check activities at S02 are carried out with the Lock Out Tag Out (LOTO) system installed and implemented in accordance with safety procedures.

Full Project »
Commence Loading B37-M01 Onto Barge

Loading of B37-M01 units onto a barge as part of the logistics and preparation stages for delivery to the project site.

Full Project »
Safety Equipment & PPE Required

– Insulated gloves
– Safety glasses
– Barricades, Signage

Full Project »
Continue testing GMAe

GMAe’s ongoing testing activities are carried out to ensure that the control and protection systems function optimally, are stable, and comply with operational standards before

Full Project »
Well Head Control Platform 6 Wells

Well Head Control Platform 6 Wells, done LER , Design, and complete installation Pre-commissioning

Full Project »
Nongsa Village Resort

Lightening protection for 100 houses, IP phone, Internet and Camera system.

Full Project »