Astoria Mooring system

We are developing an 8 point mooring system for Astoria…which is an accommodation semi-sub based in Batam.

Full Project »
Ds8 & Ds9 rigs

We have co-operated with Kelec, Houston Company in order to test and commission two Land rigs, with their customers, CTE. Power measurement as well as

Full Project »
Kantan IV Semi Sub

This is a Semi-Sub waiting to go on a Drilling Mission to China Sea. BOP test and repairs have been done, we have handled the

Full Project »
L210, Nora

Optical communication network for Kongsberg, ship control system. More than 700 Optical termination done with ABS standard, Cat 6 network connections and testing. UPS load test,

Full Project »
RCL Natuna, FPSO

ICCP system and MGPS system : repair. Impress current tuning and Marine Growth Protection System, anodes check and verification. Global Hydraulic packs systems control, Scada

Full Project »
Hallin diving vessel ‘Long-Hi’

Diving control and equipment system, connection and commissioning. Pressure chambers controls, and emergency system, gas control system, CCTV network…Moon Pool controls, umbilical and heaters.

Full Project »
Marine project lancelot
Lancelot DP3 system

Cabling and testing / Commissioning on DP3 system for  Working barge Lancelot. In cooperation with Kongsberg, implementation of redundant optic fiber network. Control / command

Full Project »
2*200T Crane synchronization

Synchronize lifting controls for 4 hooks, each of 100T. Test capacity up to 110%. Speed control for lifting 4 hooks on two different cranes simultaneously

Full Project »
Lotus 118 coal barge

Complete control system retrofit, including DC drives, PLC and PLC program as well as Optic fiber networking system. Four wire bucket crane, two cranes of

Full Project »