Chevron Pipe rack installations

We have done many pipe racks modules, installation. Project JN1154.

Full Project »
Chevron Processing module PAU 57

We have done one specific module for Chevron , Jurong , PAU 57. E&I installation and test, pre-commissioning. This is On Shore for chemical processing,

Full Project »
http://www.global-automation.in/activity-2/cranes/
Load Bank

We have the biggest Load Bank fleet in Indonesia, from 100kW to 20Mw, Low Voltage to Medium Voltage.

Full Project »
Optic Fiber

We have successfully completed optic fiber terminations for several high end O&G project, On shore and Offshore

Full Project »
Hawk Tug Boat Generator & Synchro system

Hawk is an old Tug Boat and as such, some area must be repaired. We have fixed the Generator synchronization system as well as MSb

Full Project »
Pertamina Drilling Rig Protection system update

 Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..

Full Project »
MV Vigourous MSB Calibration & TEst

6 ACB to clean and verify before its future voyage. We completed our work in record time.

Full Project »
Orinite Plant for Chevron

Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.

Full Project »
Mutiara Jawa 1, coal transhipper measuring system

3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs

Full Project »