Chevron Processing module PAU 57
We have done one specific module for Chevron , Jurong , PAU 57. E&I installation and test, pre-commissioning. This is On Shore for chemical processing,
Load Bank
We have the biggest Load Bank fleet in Indonesia, from 100kW to 20Mw, Low Voltage to Medium Voltage.
Optic Fiber
We have successfully completed optic fiber terminations for several high end O&G project, On shore and Offshore
Orinite Plant for Chevron
Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.