Keloa 407, Accomodation jack-up

New Built Keloa 407, we have done the PAGA system, Pabx, Lighting and Co2 control system

Full Project »
Mustikawati bulk carrier, Boiler control

Boiler repair at sea. Control system for boiler. Vessel Panamax.

Full Project »
Hallin Semi-Sub Derwent

Huge project, power plant commissioning, PMS, total 15MW. Optical Network for Kongsberg and ABB system, Thruster controls.

Full Project »
Curtis Island LNG project

Installation of cables and cable ladders for Curtis Island Gas Production Project modules. Forty Modules in total Global  Automation are heavily involved in the E&I

Full Project »
Gorgon project

Gorgon project, Gas compression plant. Installation of instruments cabling, cable ladders and control panels.

Full Project »
E&I

Global Automation extensive E&I experience in Module Construction for Gas Production and FPSO Topsides. All Global Automation work is carried out to the highest standards

Full Project »
Atlantic London

Conversion of Drilling Jack-up Rig to Accommodation. Facility. Global Automation worked on the Main Alarm System, Generator Synchro (PMS), Bilge Systems, Helipad, Life Boats.

Full Project »
Astoria Mooring system

We are developing an 8 point mooring system for Astoria…which is an accommodation semi-sub based in Batam.

Full Project »
Ds8 & Ds9 rigs

We have co-operated with Kelec, Houston Company in order to test and commission two Land rigs, with their customers, CTE. Power measurement as well as

Full Project »