3.3KV, 680KW conveyors soft starters

Conveyor motors, soft starter, 5 *680KW Medium voltage motors.  System upgrade and installation. Indominco Bontang, Kalimantan. 5Km long

Full Project »
Pirates Intrusion detection & active detterence

Test if IR camera intrusion detection system (automatic at sea), as well as Deterrent active speakers.

Full Project »
Power Plant test Derwent 14MW

Hallin Derwent, Power plant test, 14MW. Load banks, 690V / 60 Hz. ABB power management system

Full Project »
Favco 150T crane Test & Calibration

Crane Test and safety modules calibrations, Keppel Fels. Hydraulic and Electric.

Full Project »
Tug Boat Steering system, Azimut thrusters

Global Automation repaired and tuned the steering system controlling the Azimuth thrusters. Electrical and Hydraulic

Full Project »
Diving plateform : De compression Chambers & Ombilical

Global Automation installed breakers and interlocks to allow downgraded operation for use in Emergency situations and under limited power supply.

Full Project »
MTR 2 Cranes

We have successfully tested and calibrated the main crane of this  O&G accommodation and working barge, Keppel Fels, Singapore, Mermaid

Full Project »
Northshore Drilling vessel

On this very Technically Advanced vessel, which includes a Heave Compensated Derrick, Global Automation have installed the communication network for DP3 and K-Ship, Kongsberg. Commissioning

Full Project »
Washing tower for pipes

Controls of washing tower for pipes. Complete system, including plc, touchscreen and panels,

Full Project »