Category - Energy

Pirates Intrusion detection & active detterence

Test if IR camera intrusion detection system (automatic at sea), as well as Deterrent active speakers.

Full Project »
Power Plant test Derwent 14MW

Hallin Derwent, Power plant test, 14MW. Load banks, 690V / 60 Hz. ABB power management system

Full Project »
Diving plateform : De compression Chambers & Ombilical

Global Automation installed breakers and interlocks to allow downgraded operation for use in Emergency situations and under limited power supply.

Full Project »
MTR 2 Cranes

We have successfully tested and calibrated the main crane of this  O&G accommodation and working barge, Keppel Fels, Singapore, Mermaid

Full Project »
Northshore Drilling vessel

On this very Technically Advanced vessel, which includes a Heave Compensated Derrick, Global Automation have installed the communication network for DP3 and K-Ship, Kongsberg. Commissioning

Full Project »
Majestic Seadrill

Majestic is a new exploration drill platform, from Seadrill. Global Automation have installed the Fire and Gas Detection and Protection System, plus Mud Pump Controls.

Full Project »
IndoMinco Conveyors

Indominco is one of the largest Mining Companies in Kalimantan, with huge infrastructure. As part of an ongoing improvement, Indominco requested installation of 6 medium

Full Project »
Keloa 406, Accomodation Jack-up

Navigation instruments set-up, NMEA network communication commissioning, Radars and GDMSS. PABX, PAGA system

Full Project »
Keloa 407, Accomodation jack-up

New Built Keloa 407, we have done the PAGA system, Pabx, Lighting and Co2 control system