Category - Others

Regeneration Tower Pertamina Cilacap Blue Sky Project

E&I design , procurement and installation for this 60Mtr high tower for Regen Process for Pertamina. Project done in 6 months for a huge quantoty

Full Project »
Ocean Pearl MegaYatch Retrofit

We are working on MegaYatch retrofit Vessel Ocean Pearl, complete electrical

Full Project »
Bending & Tacking Press Machine Retrofit

Dismantling, Move and remounting of a  30 years old Hydraulic Press in BAtam area. The machine was  in need of a major upgrade and we

Full Project »
Oli&Gas Pipe Production line

Oil & Gas pipe production line, total of 43 conveyors, for pipes up to 3 tons. We have done 5 main control panels, 27 control

Full Project »
Dredging Crane 1994 Eendrach Retrofit

Dredging crane retrofit for DC generator, 900kw drive, and repair of control logic.

Full Project »
Pusri Indonesia I, Phosphate Bulk Carrier 120m long

Complete Electrical system for Bulk Carrier Pusri Indonesia I, 17500 Dwt, 120m long. From Load calculation to panel design, manufacture, test & commissioning. All systems

Full Project »