Load Bank

April 16, 2016 - No Comments

We have the biggest Load Bank fleet in Indonesia, from 100kW to 20Mw, Low Voltage to Medium Voltage.

Full Story »

Optic Fiber

April 16, 2016 - No Comments

We have successfully completed optic fiber terminations for several high end O&G project, On shore and Offshore

Full Story »

Hawk Tug Boat Generator & Synchro system

November 25, 2015 - No Comments

Hawk is an old Tug Boat and as such, some area must be repaired. We have fixed the Generator synchronization system as well as MSb

Full Story »

Pertamina Drilling Rig Protection system update

November 25, 2015 - No Comments

 Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..

Full Story »

MV Vigourous MSB Calibration & TEst

November 24, 2015 - No Comments

6 ACB to clean and verify before its future voyage. We completed our work in record time.

Full Story »

Orinite Plant for Chevron

November 19, 2015 - No Comments

Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.

Full Story »

Mutiara Jawa 1, coal transhipper measuring system

November 18, 2015 - No Comments

3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs

Full Story »

ESS800 & ESS001 YAnmal project, EHouses

November 15, 2015 - No Comments

E&I installation on ESS800 Yanmal project @ Siemens. Lighting, Earthing and basic equipment installation. Project to be completed in RUSSIA

Full Story »

Main Switch Board and Emergency Switch Board Pertamina Tanker

November 15, 2015 - No Comments

Calculate, Design, Produce and certify MSB and ESB, 440V. 60Hz. Group starter panels and Starter panel individual as well

Full Story »