
November 15, 2015 - No Comments
E&I installation on ESS800 Yanmal project @ Siemens. Lighting, Earthing and basic equipment installation. Project to be completed in RUSSIA
Full Story »

November 15, 2015 - No Comments
Calculate, Design, Produce and certify MSB and ESB, 440V. 60Hz. Group starter panels and Starter panel individual as well
Full Story »

November 15, 2015 - No Comments
Conversion from DC motors, Ward Leonard system to AC drives, for Hoist & Boom.
Full Story »

November 15, 2015 - No Comments
Calibration of the main vessel weather instrument, including warnings on Pressure drops and winds.
Full Story »

November 15, 2015 - No Comments
E&I installation of metering skid for Oil, including Heat Tracing installation and sampling system.
Full Story »

November 15, 2015 - No Comments
Loading vessel which brings 5 modules to Russia, need external container with Transformers and power supplies , step Down.
We have done the design, calculations,
Full Story »

November 15, 2015 - No Comments
Load TEst 6Mva @690V on this vessel , electrical propulsion
Full Story »

November 15, 2015 - No Comments
Cleaning and testing of all vaccum breakers , bus bar, and protections test for the MV and LV , MSB and ESB Panels. Hynday and
Full Story »

November 15, 2015 - No Comments
Load Test done on Two Ulstein Design Reverse Bow PSV, High tech vessels. Power plant 10 Mw.
Full Story »