Chevron Pipe rack installations

November 21, 2016 - No Comments

We have done many pipe racks modules, installation. Project JN1154.

Full Story »

Chevron Processing module PAU 57

November 21, 2016 - No Comments

We have done one specific module for Chevron , Jurong , PAU 57. E&I installation and test, pre-commissioning. This is On Shore for chemical processing,

Full Story »

http://www.global-automation.in/activity-2/cranes/

Load Bank

April 16, 2016 - No Comments

We have the biggest Load Bank fleet in Indonesia, from 100kW to 20Mw, Low Voltage to Medium Voltage.

Full Story »

Optic Fiber

April 16, 2016 - No Comments

We have successfully completed optic fiber terminations for several high end O&G project, On shore and Offshore

Full Story »

Hawk Tug Boat Generator & Synchro system

November 25, 2015 - No Comments

Hawk is an old Tug Boat and as such, some area must be repaired. We have fixed the Generator synchronization system as well as MSb

Full Story »

Pertamina Drilling Rig Protection system update

November 25, 2015 - No Comments

 Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..

Full Story »

MV Vigourous MSB Calibration & TEst

November 24, 2015 - No Comments

6 ACB to clean and verify before its future voyage. We completed our work in record time.

Full Story »

Orinite Plant for Chevron

November 19, 2015 - No Comments

Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.

Full Story »

Mutiara Jawa 1, coal transhipper measuring system

November 18, 2015 - No Comments

3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs

Full Story »