
November 21, 2016 - No Comments
We have done many pipe racks modules, installation. Project JN1154.
Full Story »

November 21, 2016 - No Comments
We have done one specific module for Chevron , Jurong , PAU 57. E&I installation and test, pre-commissioning. This is On Shore for chemical processing,
Full Story »

April 16, 2016 - No Comments
We have the biggest Load Bank fleet in Indonesia, from 100kW to 20Mw, Low Voltage to Medium Voltage.
Full Story »

April 16, 2016 - No Comments
We have successfully completed optic fiber terminations for several high end O&G project, On shore and Offshore
Full Story »

November 25, 2015 - No Comments
Hawk is an old Tug Boat and as such, some area must be repaired. We have fixed the Generator synchronization system as well as MSb
Full Story »

November 25, 2015 - No Comments
Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..
Full Story »

November 24, 2015 - No Comments
6 ACB to clean and verify before its future voyage. We completed our work in record time.
Full Story »

November 19, 2015 - No Comments
Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.
Full Story »

November 18, 2015 - No Comments
3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs
Full Story »