February 11, 2026 - No Comments
Line check of HIPOT equipment and required specific PPE at S03.
Full Story »

February 11, 2026 - No Comments
Line check confirms that LOTO implementation is compliant with safety procedures.
Full Story »

February 11, 2026 - No Comments
Line check activities at S02 are carried out with the Lock Out Tag Out (LOTO) system installed and implemented in accordance with safety procedures.
Full Story »

February 11, 2026 - No Comments
Loading of B37-M01 units onto a barge as part of the logistics and preparation stages for delivery to the project site.
Full Story »

February 11, 2026 - No Comments
– Insulated gloves
– Safety glasses
– Barricades, Signage
Full Story »

February 11, 2026 - No Comments
GMAe’s ongoing testing activities are carried out to ensure that the control and protection systems function optimally, are stable, and comply with operational standards before
Full Story »

September 23, 2020 - No Comments
Well Head Control Platform 6 Wells, done LER , Design, and complete installation Pre-commissioning
Full Story »

February 26, 2019 - No Comments
Lightening protection for 100 houses, IP phone, Internet and Camera system.
Full Story »