
March 4, 2013 - No Comments
We are developing an 8 point mooring system for Astoria…which is an accommodation semi-sub based in Batam.
Full Story »

March 4, 2013 - No Comments
We have co-operated with Kelec, Houston Company in order to test and commission two Land rigs, with their customers, CTE. Power measurement as well as
Full Story »

March 4, 2013 - No Comments
This is a Semi-Sub waiting to go on a Drilling Mission to China Sea. BOP test and repairs have been done, we have handled the
Full Story »

November 13, 2012 - No Comments
Optical communication network for Kongsberg, ship control system. More than 700 Optical termination done with ABS standard, Cat 6 network connections and testing. UPS load test,
Full Story »

November 13, 2012 - No Comments
ICCP system and MGPS system : repair. Impress current tuning and Marine Growth Protection System, anodes check and verification. Global Hydraulic packs systems control, Scada
Full Story »

November 13, 2012 - No Comments
Diving control and equipment system, connection and commissioning. Pressure chambers controls, and emergency system, gas control system, CCTV network…Moon Pool controls, umbilical and heaters.
Full Story »

November 13, 2012 - No Comments
Cabling and testing / Commissioning on DP3 system for Working barge Lancelot. In cooperation with Kongsberg, implementation of redundant optic fiber network. Control / command
Full Story »

November 13, 2012 - No Comments
Synchronize lifting controls for 4 hooks, each of 100T. Test capacity up to 110%. Speed control for lifting 4 hooks on two different cranes simultaneously
Full Story »

November 13, 2012 - No Comments
Complete control system retrofit, including DC drives, PLC and PLC program as well as Optic fiber networking system. Four wire bucket crane, two cranes of
Full Story »