June 2, 2013 - No Comments
Conveyor motors, soft starter, 5 *680KW Medium voltage motors. System upgrade and installation. Indominco Bontang, Kalimantan. 5Km long
Full Story »

June 2, 2013 - No Comments
Test if IR camera intrusion detection system (automatic at sea), as well as Deterrent active speakers.
Full Story »

June 2, 2013 - No Comments
Hallin Derwent, Power plant test, 14MW. Load banks, 690V / 60 Hz. ABB power management system
Full Story »

June 2, 2013 - No Comments
Crane Test and safety modules calibrations, Keppel Fels. Hydraulic and Electric.
Full Story »

April 20, 2013 - No Comments
Global Automation repaired and tuned the steering system controlling the Azimuth thrusters. Electrical and Hydraulic
Full Story »

April 7, 2013 - No Comments
Global Automation installed breakers and interlocks to allow downgraded operation for use in Emergency situations and under limited power supply.
Full Story »

March 31, 2013 - No Comments
We have successfully tested and calibrated the main crane of this O&G accommodation and working barge, Keppel Fels, Singapore, Mermaid
Full Story »

March 23, 2013 - No Comments
On this very Technically Advanced vessel, which includes a Heave Compensated Derrick, Global Automation have installed the communication network for DP3 and K-Ship, Kongsberg. Commissioning
Full Story »

March 17, 2013 - No Comments
Controls of washing tower for pipes. Complete system, including plc, touchscreen and panels,
Full Story »