
March 23, 2013 - No Comments
On this very Technically Advanced vessel, which includes a Heave Compensated Derrick, Global Automation have installed the communication network for DP3 and K-Ship, Kongsberg. Commissioning
Full Story »

March 17, 2013 - No Comments
Controls of washing tower for pipes. Complete system, including plc, touchscreen and panels,
Full Story »

March 17, 2013 - No Comments
Global Automation in-house Research and Development team have designed and fabricated a Robotic Device which will cut piping precisely with the correct bevel required prior
Full Story »

March 17, 2013 - No Comments
Global Automation in-house Research and Development team have designed and fabricated a Demag System for Pipe Laying barges, the system integrates a magnetic reader, and
Full Story »

March 17, 2013 - No Comments
The machine was imported to Batam from Korea, it is the largest flanging machine in SE Asia. Global Automation repaired the control system, installed. tested
Full Story »

March 17, 2013 - No Comments
The machine was imported to Batam from Korea, it is the largest flanging machine in SE Asia. Global Automation repaired the control system, installed. tested
Full Story »

March 17, 2013 - No Comments
Main engines caterpillar, 3516, Main engine alarms and controls. Vessel now in Angola.
Full Story »

March 17, 2013 - No Comments
Repair of Main Engine Alarm System, test with Class and at Sea. Change pressure gauges. Sea Water cooling system repair / Close loop
Full Story »

March 17, 2013 - No Comments
Global Automation repaired the crane synchro system and the Main Boiler. All Boiler Control System and Safety Devices were missing or not functioning, Global Automation
Full Story »