
June 14, 2013 - No Comments
Accommodation Barge Sea Heaven 7, we have provide complete PMS, Msb, as well as PAga, Fire alarm, Phone system, Gas Alarm, Ch4 alarms, and crane
Full Story »

June 2, 2013 - No Comments
Module for Sea Water treatment, High pressure vessels , E&I installation & Testing. Modec strict standard, Ex Proof.
Full Story »

June 2, 2013 - No Comments
Conveyor motors, soft starter, 5 *680KW Medium voltage motors. System upgrade and installation. Indominco Bontang, Kalimantan. 5Km long
Full Story »

June 2, 2013 - No Comments
Test if IR camera intrusion detection system (automatic at sea), as well as Deterrent active speakers.
Full Story »

June 2, 2013 - No Comments
Hallin Derwent, Power plant test, 14MW. Load banks, 690V / 60 Hz. ABB power management system
Full Story »

June 2, 2013 - No Comments
Crane Test and safety modules calibrations, Keppel Fels. Hydraulic and Electric.
Full Story »

April 20, 2013 - No Comments
Global Automation repaired and tuned the steering system controlling the Azimuth thrusters. Electrical and Hydraulic
Full Story »

April 7, 2013 - No Comments
Global Automation installed breakers and interlocks to allow downgraded operation for use in Emergency situations and under limited power supply.
Full Story »

March 31, 2013 - No Comments
We have successfully tested and calibrated the main crane of this O&G accommodation and working barge, Keppel Fels, Singapore, Mermaid
Full Story »