Category - All

Hawk Tug Boat Generator & Synchro system

Hawk is an old Tug Boat and as such, some area must be repaired. We have fixed the Generator synchronization system as well as MSb

Full Project »
Pertamina Drilling Rig Protection system update

 Update of complete Drilling rig protection system, Pertamina, in Remote mountain area, Benculu. Geothermal energy Drilling..

Full Project »
MV Vigourous MSB Calibration & TEst

6 ACB to clean and verify before its future voyage. We completed our work in record time.

Full Project »
Orinite Plant for Chevron

Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.

Full Project »
Mutiara Jawa 1, coal transhipper measuring system

3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs

Full Project »
ESS800 & ESS001 YAnmal project, EHouses

E&I installation on ESS800 Yanmal project @ Siemens. Lighting, Earthing and basic equipment installation. Project to be completed in RUSSIA

Full Project »
Main Switch Board and Emergency Switch Board Pertamina Tanker

Calculate, Design, Produce and certify MSB and ESB, 440V. 60Hz. Group starter panels and Starter panel individual as well

Full Project »
Jib Crane YC43 Hoist & Boom conversion from DC to AC motors

Conversion from DC motors, Ward Leonard system to AC drives, for Hoist & Boom.

Full Project »
NOV Weather Station Calibration

Calibration of the main vessel weather instrument, including warnings on Pressure drops and winds.

Full Project »