Category - Marine

DRU Pertamina Tanker

Power Panels and systems delivery/ Sea Trials and commissioning, Pertamina 17500DWT Oil Tanker

Full Project »
Hawk Tug Boat Generator & Synchro system

Hawk is an old Tug Boat and as such, some area must be repaired. We have fixed the Generator synchronization system as well as MSb

Full Project »
MV Vigourous MSB Calibration & TEst

6 ACB to clean and verify before its future voyage. We completed our work in record time.

Full Project »
Orinite Plant for Chevron

Pipe Racks and Two process modules for Chevron new Oronite PLant. We have done the E&I installation, this is batch 1.

Full Project »
Mutiara Jawa 1, coal transhipper measuring system

3000t/hour transhipper from Korea, needing calibration of “On the fly” measuring system, and systems repairs

Full Project »
Main Switch Board and Emergency Switch Board Pertamina Tanker

Calculate, Design, Produce and certify MSB and ESB, 440V. 60Hz. Group starter panels and Starter panel individual as well

Full Project »
NOV Weather Station Calibration

Calibration of the main vessel weather instrument, including warnings on Pressure drops and winds.

Full Project »
Red Zed 1 Power upgrade package for modules power up

Loading vessel which brings 5 modules to Russia, need external container with Transformers and power supplies , step Down.
We have done the design, calculations,

Full Project »
Load test on MMA Vessel Electrical Propulsion

Load TEst 6Mva @690V on this vessel , electrical propulsion

Full Project »