Quito Tarakan 1
Crane Barge overhaul complete system , Turn Key : Power Management, Main Engines, Navigation Lights, Crane, Pumps.
Floating Dock Retrofits
Very old but strong floating dock from US Navy. Retrofit of old dc drives, Crane controls. On the dock, tank gauging system, Pump soft starter,
2*200T Crane synchronization
Synchronize lifting controls for 4 hooks, each of 100T. Test capacity up to 110%. Speed control for lifting 4 hooks on two different cranes simultaneously
Lotus 118 coal barge
Complete control system retrofit, including DC drives, PLC and PLC program as well as Optic fiber networking system. Four wire bucket crane, two cranes of
Lotus 668 Dredging Barge Retrofit
Retrofit of control system on Dredging Barge DC Motor Drives. Change Thyristor Banks, test and commissioning, DC Motor Controls, test DC drives in parallel..
Cranes
We have developed our crane control software, including motor drives and safety features, from overhead to big dredging cranes, retrofits or new ones.